Monday, October 25, 2010
Healthy Progress!
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiplA_hD8igblMtf4ir-ZGWslM7YVxiHZlEIJNPcuYzTn_5lSPXe4j2ugzDLSNscBaw1skjmM-ZszD3ckxU9wgkYythP7uARMYKafvUhtt7LpDLPTzku6eRqh5v2lflBvcAMQ5K6ciKJRE/s200/block_truck.jpg)
We got sick. One after the other, after the other. Now we are mostly healthy! While we were sick, lots of progress as been made.
- Concrete guys came and poured the footer.
- A big truck came and delivered block. Another came and delivered brick layers. (Yes, it's a terrible picture. I am sorry.)
- After that, I think my husband and father-in-law-contractor put in a layer of insulation.
- Then another layer of concrete from the big truck to do the floor.
- Now we have a delivery of lumber! Very exciting.
We also ordered our cabinets (the night I was starting to get sick). They will be delivered the week of Thanksgiving. Hopefully, we will have a room to put them in.
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment